Since March, communication between two gas-piston generator units, each with its own TPEM control system, and the higher-level Siemens S7-1500 had been disrupted due to a failed Weidmüller communication controller. A direct replacement was not possible because the required hardware and software were unavailable. The task was to develop a modern replacement, restore data exchange and return the installation to operation without rebuilding the existing control system.